DPF

NOAA Underwater Pier Project

Department of Commerce/NOAA

Jeanie Jennings
(816)426-7458
WC-133F-RQ-0476

Scope: Remove underwater dock and replace with floating dock system for access to seawater intake pipes system.

Details: Design-Build replacement of the Existing Underwater Pier at Northeast Fisheries Science Center, Milford Laboratory 212 Rogers Avenue, Milford, CT. Design, install and construct a new floating dock system. Work includes but not limited to demolition of existing underwater dock, pile removal, pile driving, a new floating dock and gangway, concrete work, an Air Diffusion System (ADS), security fence at the gangway entrance, all required and stated accessories.